Scheme wise Financial Summary
As on 29-03-2024 19:10
S.No. Scheme Name Total Allocation (Cr.) DAPSC Allocation (Cr.) % DAPSC Allocation w.r.t. Total Allocation Revised Allocation (Cr.) % Revised Allocation w.r.t. Total Allocation Expenditure (Cr.) % Expenditure w.r.t. Revised Allocation
1 Human Resources Development and Training 37 1 2.7 % 1 2.7 % 1 100 %
2 Wind Power 1100 150 13.64 % 150 13.64 % 150 100 %
3 Solar Power 2369.13 165 6.96 % 164 6.92 % 51.3291 31.3 %
4 Green Energy Corridors 300 40 13.33 % 40 13.33 % 24.6711 61.68 %
5 Biogas Programme 95 20 21.05 % 9 9.47 % 0.0384 0.43 %
6 Kisan Urja Suraksha evam Utthaan Mahabhiyan (KUSUM) 221 51 23.08 % 10 4.52 % 0 0 %
7 Kisan Urja Suraksha evam Utthaan Mahabhiyan (KUSUM) 776.3 42 5.41 % 0 0 % 18.3245 0 %
Total 4898.43 469 9.57 % 374 7.64 % 245.3632 65.61 %