Scheme wise Financial Summary
As on 27-12-2024 07:10
S.No. Scheme Name Total Allocation (Cr.) DAPSC Allocation (Cr.) % DAPSC Allocation w.r.t. Total Allocation Revised Allocation (Cr.) % Revised Allocation w.r.t. Total Allocation Expenditure (Cr.) % Expenditure w.r.t. Revised Allocation
1 Electronic Governance
» Program Component
530.74 50 9.42 % 50 9.42 % 0 0 %
2 National Knowledge Network 352 30 8.52 % 30 8.52 % 30 100 %
3 Promotion of Electronics and IT HW Manufacturing (MSIPS, EDF and Manufacturing Clusters) 700 50 7.14 % 17.34 2.48 % 0 0 %
4 Promotion of IT/ITeS Industries 150 9 6 % 6 4 % 0 0 %
5 R and D in IT/Electronics/CCBT 600 50 8.33 % 80 13.33 % 41.1509 51.44 %
6 Promotion of Digital payment 1500 79.54 5.3 % 134.04 8.94 % 134.04 100 %
7 Cyber Security Projects 400 25 6.25 % 25 6.25 % 10 40 %
8 Capacity Building and Skill Development Scheme 537.5 50 9.3 % 40.4 7.52 % 46.0449 113.97 %
9 Modified Programme for Development of Semiconductors and Display Manufacturing Ecosystem in India
» Modified Scheme for Setting up of Semiconductor Fabs in India
1000 83 8.3 % 0 0 % 0 0 %
10 Modified Programme for Development of Semiconductors and Display Manufacturing Ecosystem in India
» Modified Scheme for setting up of Display Fabs in India
0.04 0.01 25 % 0 0 % 0 0 %
11 Modified Programme for Development of Semiconductors and Display Manufacturing Ecosystem in India
» Modernisation of Semi-Conductor Laboratory, Mohali
0.04 0.01 25 % 0 0 % 55.7109 0 %
12 Modified Programme for Development of Semiconductors and Display Manufacturing Ecosystem in India
» Modified Scheme for setting up of Compound Semiconducors Silicon Photonics Sensors Fab Discrete Semiconductors Fab and Semiconductor (ATMP)/ (OSAT) facilities in India
1799.92 148.98 8.28 % 118 6.56 % 0 0 %
13 Modified Programme for Development of Semiconductors and Display Manufacturing Ecosystem in India
» Design Linked Incentive Scheme
200 17 8.5 % 0 0 % 3.771 0 %
14 Production Linked Incentive Scheme (PLI)
» Production linked Incentive for Large Scale Electronics Manufacturing
4499.04 428 9.51 % 370.1 8.23 % 16.5154 4.46 %
15 Production Linked Incentive Scheme (PLI)
» Production Linked Incentive for IT Hardware
146 12 8.22 % 4.9 3.36 % 350.7491 7158.15 %
16 Transfer Entry 350.7491
Total 12415.28 1032.54 8.32 % 875.78 7.05 % 682.6091 78.56 %