Scheme wise Financial Summary
As on 15-03-2025 06:28
S.No.Scheme NameTotal Allocation (Cr.)DAPSC Allocation (Cr.)% DAPSC Allocation w.r.t. Total AllocationRevised Allocation (Cr.)% Revised Allocation w.r.t. Total AllocationExpenditure (Cr.)% Expenditure w.r.t. Revised Allocation
1 Ayushman Bharat-Pradhan Mantri Jan Arogya
» Support from (PMSSN)
7089 1232.25 17.38 % 1272.55 17.95 % 838.1256 65.86 %
2 Infrastructure Maintenance
» Gross Budgetary Support (GBS)
3831.32 1735.2 45.29 % 1735.2 45.29 % 1731.5966 99.79 %
3 Pradhan Mantri Ayushman Bharat Health Infrastructure Mission (PMABHIM) 4107.68 519.98 12.66 % 487.48 11.87 % 199.094 40.84 %
4 Flexible Pool for RCH & Health System Strengthening National Health Programme and National Urban Health Mission
» Gross Budgetary Support (GBS)
29093.5 5424.57 18.65 % 5344.45 18.37 % 4269.7175 79.89 %
5 Strengthening of State Drug Regulatory System 75 9.51 12.68 % 6.5 8.67 % 0 0 %
6 Tertiary Care Programme 371.55 19.93 5.36 % 11.28 3.04 % 7.1695 63.56 %
7 Human Resources for Health and Medical Education 5016 216.61 4.32 % 69.72 1.39 % 27.06 38.81 %
8 Transfer Entry 27.06
Total49584.059158.0518.47 %8927.1818 %7732.409479.23 %
Ministry/Department Name: Department of Health and Family Welfare
Showing 1 to 8 of 8 entries