Scheme wise Financial Summary
As on 30-04-2026 19:01
S.No. Scheme Name Total Allocation (Cr.) DAPSC Allocation (Cr.) % DAPSC Allocation w.r.t. Total Allocation Revised Allocation (Cr.) % Revised Allocation w.r.t. Total Allocation Expenditure (Cr.) % Expenditure w.r.t. Revised Allocation
1 Flexible Pool for RCH & Health System Strengthening, National Health Programme and National Urban Health Mission
» Flexible Pool for RCH & Health System Strengthening, National Health Programme and National Urban Health Mission
39321.27 6441.34 16.38 % 0 0 % 0 0 %
2 Pradhan Mantri Ayushman Bharat Health Infrastructure Mission (PMABHIM) 4200 677.92 16.14 % 0 0 % 0 0 %
3 Infrastructure Maintenance 7350 1622.7 22.08 % 0 0 % 0 0 %
4 Ayushman Bharat - Pradhan Mantri Jan Arogya Yojana (PMJAY) 9500 1414.2 14.89 % 0 0 % 0 0 %
5 Human Resources for Health and Medical Education 1725 252.99 14.67 % 0 0 % 0 0 %
Total 62096.27 10409.15 16.76 % 0 0 % 0 0 %